Services
Renders, shop drawings and take-offs for UAE projects
Choose a service to see what is included, what to send and how long it takes. When a project needs several, one quote covers all of them.
3D visualisation
Renders, animations and floor plans for UAE projects
- 3D rendering servicesFrom a single villa to a master community, we turn your drawings into photoreal renders for sales launches, client approvals and authority presentations.First draft in 3 to 5 working days for most single renders
- Villa, tower & exterior rendersAn exterior render is the image buyers remember: the facade, the landscaping, the pool deck and the evening light.First draft in 3 to 5 working days
- Interior & fit-out rendersInterior renders sell show apartments, win fit-out tenders and get designs signed off.First draft in 3 to 5 working days per room
- Off-plan development rendersOff-plan projects are sold on images.Quoted per project; first views in about 5 to 8 working days
- Retail, hospitality & office rendersLandlords, brands and operators approve fit-outs they can see.First draft in 4 to 6 working days
- 3D animation & walkthroughsA walkthrough takes buyers from the community gate to the balcony in under two minutes.Usually 2 to 4 weeks, depending on length
- 2D & 3D floor plansBuyers compare layouts before they compare prices.1 to 2 working days for most units
Drafting, CAD & BIM
AutoCAD drafting, Revit and BIM models, and PDF conversions
- AutoCAD drafting servicesSend sketches, red-lined PDFs or site measurements and we produce clean, layered AutoCAD drawings: plans, elevations, sections, details and as-builts.Most drawing sets in 3 to 5 working days
- PDF to CAD conversionOlder buildings often survive only as scans or flattened PDFs.2 to 4 working days for most villas and floors
- Revit & BIM modellingLarger buildings in Dubai go to the authority with a BIM model, and many consultants and contractors now coordinate their work in one.Quoted per model, with a delivery date for each package
Shop drawings
Joinery, fit-out and facade shop drawings
- Joinery & fit-out shop drawingsConsultants approve shop drawings before anything is manufactured.Quoted per package; most rooms in 3 to 5 working days
- Facade & cladding shop drawingsCladding goes up faster when every panel, joint and bracket is set out before fabrication.3 to 5 working days per elevation package
Take-offs & BOQs
Measured quantities and cost estimates
Off-plan marketing
Brochures, floor plans and launch visuals