Skip to content
3D Design Studios

Take-offs & BOQs

Quantity take-offs and BOQs

Tenders in Dubai and across the UAE move fast, and measuring is the slow part. Send the tender drawings and we return measured quantities and a bill of quantities in your format, with marked-up drawings showing exactly what was measured.

Price
From AED 550 per project, excl. VAT
Turnaround
2 to 5 working days, depending on the package
Coloured site plan used for measured quantities

What we measure

  • Fit-out: partitions, gypsum ceilings, flooring and joinery
  • Finishes: tiling, stone, paint and wall coverings
  • Facade cladding and glazing areas
  • Blockwork, plaster and screed
  • Doors, ironmongery and fixtures by count

In the format you price in

Send your BOQ template, or tell us the method of measurement the tender uses, and we lay the quantities out to match, so your estimator can price straight from our sheet.

Support for your QS team, not a replacement

We are not a quantity surveying practice and we do not certify quantities. We do the measuring for your quantity surveyors and estimators, who keep control of the BOQ and the price.

Outsourcing your bills of quantities

Outsourcing the measuring is how many UAE contractors and fit-out firms get through tender season: your estimators price, we measure. Each package comes back with the BOQ, the marked-up drawings and a query list, so every quantity can be checked line by line before it goes into the tender.

Projects in Saudi Arabia and the wider GCC

The quantities come from the drawings, so the site can be anywhere. We also prepare take-offs and BOQs for contractors bidding in Saudi Arabia, Qatar, Oman, Bahrain and Kuwait, in the format, units and method of measurement the tender documents ask for.

Questions we are asked

Which method of measurement do you follow?

Tell us the method of measurement or BOQ format the tender uses, and we measure and lay out the quantities to suit it, or say so at the quote stage if it is outside what we do.

Do you price the BOQ?

A take-off is quantities only. Our cost estimating service can add the rates you provide.

Can you prepare a BOQ for a project in Saudi Arabia?

Yes. We measure from the tender drawings wherever the site is, and lay out the quantities to the format and method of measurement the tender sets.

How quickly can you return a tender take-off?

Most packages take 2 to 5 working days. Send the tender deadline with the drawings, and the quote gives a return date that leaves your team time to price.